Business

Construction Equipment and Infrastructure: Why India is betting Rs 11,000 crore on construction, infrastructure equipment manufacturing – explained

The Union Cabinet has approved a Rs 11,000-crore scheme to strengthen India’s construction machinery and infrastructure (CIE) manufacturing system, focusing on increasing domestic production, supporting component manufacturers and establishing a dedicated testing facility.These decisions were announced by Union minister Ashwini Vaishnaw at a press conference following the Cabinet meeting chaired by Prime Minister Narendra Modi.The Strategy for the Development of Building Materials and Infrastructure Equipment will be implemented by the Department of Heavy Industries over eight years, starting from the financial year 2026-27.It aims to encourage manufacturers to expand production of more technologically advanced materials and reduce dependence on foreign supply chains.The government has identified equipment such as ship-to-shore cranes, tunnel boring machines, hydraulic excavators and highway trucks as areas the program aims to support.The approval comes as the government clears major infrastructure projects, including a second container terminal at Kamarajar Port in Tamil Nadu and a greenfield airport at Doloo in Assam.The port project has been approved at an estimated cost of Rs 4,288.26 crore, while the airport project has a cost of Rs 2,014 crore.

Why did the government launch this program?

India’s construction and infrastructure machinery industry is currently the third largest in the world, behind China and the United States. Its market size stands at around Rs 97,500 crore by 2024-25, according to the heavy industries ministry.This sector is expected to grow significantly as investment in infrastructure, including roads and ports, and housing increases. The government projects that the domestic market will more than double to Rs 2.28 lakh crore by 2029-30.Construction and infrastructure projects require a range of specialized equipment, from excavators and tunneling machines to cranes deployed in ports and equipment used in the construction of large factories and roads.The program aims to encourage local manufacturers to produce more of these equipment and parts. It also aims to strengthen India’s position in the global CIE market by developing indigenous manufacturing capabilities and improving supply chain security.The government has linked this initiative with the Atmanirbhar Bharat initiative and its broader objective of creating a self-sustaining industrial base.

How will the Rs 11,000-crore scheme work?

The program has two main components: an incentive program linked to the sales of manufacturers and financial support to set up a dedicated testing facility.1. Sales-related subsidies for manufacturersThe first phase will provide incentives based on incremental sales of eligible construction and infrastructure equipment and components.Benefits will be available to approved applicants in two categories:

  • Original equipment manufacturers (OEMs)
  • Parts manufacturers

Profit rates will be adjusted, from 13% to 8% of the incremental sales value over a period of five years.This section is intended to encourage manufacturers to expand domestic production and increase sales of relevant equipment and parts.2. Grant of a dedicated test siteThe second tranche provides funding of up to Rs 375 crore, in the form of operational gap funding, to establish a dedicated CIE testing center in India.This center aims to support the assessment of building materials and infrastructure in the country. This provision is part of the government’s effort to improve the domestic ecosystem and productivity.

What is the timeline for implementation?

The program will run for eight years, from 2026-27 to 2033-34, and its implementation is divided into three phases.

Time What’s going on
FY2026-27 to FY2027-28 Two-year gestation period for setting up production facilities
FY2028-29 to FY2032-33 The five-year period for the issuance of grants
FY2033-34 Payment of incentives linked to incremental sales in FY2032-33

The first two years will allow approved applicants to establish production facilities. Incentives will then be paid over the next five years, based on incremental sales of qualifying equipment and parts. The last year will be used to pay compensation for the last year of the payment period.

What things will benefit?

This program is intended for the construction of advanced technology and infrastructure equipment used in all major infrastructure and industrial projects.The government specifically identified:

  • Ship to shore cranes: Equipment used to load and unload containers between ships and port terminals.
  • Tunnel boring machines: Special equipment used to dig tunnels for infrastructure projects.
  • Hydraulic excavators: Machines used for digging, moving earth and other construction works.
  • Off-highway trucks: Heavy duty vehicles used to transport construction materials, mines and industrial sites.

The program also includes relevant components produced by approved applicants, rather than focusing solely on finished items.

What does the government expect from this plan?

The government expects these incentives to increase domestic manufacturing capacity, improve availability of machinery and parts, strengthen supply chains and create jobs.The proposed test center is another part of the effort to develop the domestic manufacturing ecosystem.As the CIE market is expected to grow from Rs 97,500 crore in 2024-25 to Rs 2.28 lakh crore in 2029-30, the initiative aims to support manufacturers as the demand for construction and infrastructure equipment increases.The government has put this plan as part of its Atmanirbhar Bharat plan, with the stated goal of making India more self-sufficient in the production of technologically advanced machinery and more competitive in the global market.


Source link

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button